For the engineering and installation of a new 39.6 m (130 ft) diameter. 16500m3, Distillate Tank, including early development (pre-FEED, FEED), detailed engineering, procurement & construction management. Commissioning Q3/17.
- Distillate storage tank integration
- Tank foundation and berm design
-
Leak detection & mgmt. system
-
Firewater supply and access roads
-
Existing facility piping interconnects
-
Energy efficient electrical systems
-
State of the art instruments for measuring and monitoring
-
Initial economics, feasibility, concept selection, execution plans and basis for design
-
Detailed engineering for: process, civil earthworks & structural, mechanical, piping, electrical and instrumentation, engineering support during construction and closeout
-
Delivered on time and under budget.